Office Containers
Modular office cabins with insulation, flooring, lighting and AC provision.
- • 10ft / 20ft / 40ft options
- • Single & multi-room layouts
- • Fit-outs: electrical, plumbing, HVAC
Udyog Vihar Phase 3 • Gurugram • Faridabad • Panipat
SR Enterprises provides robust MS office containers, portable cabins, security cabins and toilet units across Udyog Vihar Phase 3 with fast local delivery, installation and custom fit-outs.
400+
Units delivered in Udyog Vihar Phase 3
5–18 days
Typical delivery time
Turnkey
Design • Supply • Install
20ft MS Office Container
Insulated • Furnished • Electrical fit-out
Price
₹ On Request
Fabricated from certified IS 2062 structural steel to withstand Udyog Vihar Phase 3's local weather conditions, high industrial loads, and multi-relocation wear.
| Component | Material Specification | Engineering Advantage |
|---|---|---|
| Main Chassis Frame | IS 2062 Grade MS 100x50mm C-Channels & Tubular Sections | Heavy-duty structural base; supports multi-storey crane stacking |
| Wall & Roof Shell | 1.2mm to 1.6mm thick Corrugated Mild Steel Sheets | 100% leak-proof, storm-resistant, secure against vandalism |
| Thermal Insulation | 50mm High-Density Glass Wool / Rigid PUF Panels | Maintains 24°C interior temperature in extreme climates |
| Interior Paneling | 9mm Pre-Laminated Particle Board or PVC Decorative Panels | Fire-retardant, elegant executive finish, easy to clean |
| Sub-Floor & Vinyl | 18mm Cement Fiber Board + 1.5mm Heavy PVC Vinyl | Rot-proof, moisture-sealed, anti-skid, high wear resistance |
| Electrical Network | Concealed ISI Fire-Retardant Copper Wiring + MCB Distribution | Shockproof, pre-wired for 1.5T AC, LED lighting and IT ports |
| Paint & Coating | Epoxy Zinc Phosphate Primer + Two Coats Synthetic PU Enamel | High UV resistance, prevents rust and oxidation in humid weather |
SR Enterprises delivers state-of-the-art prefabricated cabins and temporary office containers directly to Udyog Vihar Phase 3. Built on a heavy structural steel base with anti-corrosive primer, our containers ensure maximum safety and comfort. Our prefabricated structures offer zero-maintenance and are ready for immediate deployment in Udyog Vihar Phase 3 Area and neighboring blocks.
Modular office cabins with insulation, flooring, lighting and AC provision.
Quick-install porta cabins for site teams, kiosks and temporary accommodation.
Compact guard cabins with glazing, counters and lockable doors.
Hygienic ablution blocks and toilet cabins ideal for events & sites.
Modified containers for workshops, storage, server rooms and branded cabins.
Stacked or linear multi-unit solutions for project HQs and accommodation.
Our units are widely used across manufacturing, warehousing, construction, events and institutional projects in Udyog Vihar Phase 3.
Site offices, worker accommodation and storage for contractors.
Factory site cabins, security posts and storerooms for industrial parks.
Temporary cabins, ticketing booths and toilet blocks for events and institutions.
Simple four-step delivery model: discuss → design & quote → fabricate → deliver & install.
Step 1
Tell us your site needs — we’ll advise on sizes, layout and specs.
Step 2
Receive drawings, itemised pricing and lead times.
Step 3
Production in our workshop with quality checks at each stage.
Step 4
Logistics, placement & final commissioning at the site.
A glimpse of our office cabins, porta cabins, and sanitation units deployed and operational in and around Udyog Vihar Phase 3.
SR Enterprises provides seamless delivery, custom design, and turnkey on-site installation of MS office containers, site cabins, security guard cabins, and sanitation toilet blocks across every corridor, sector, and industrial area in Udyog Vihar Phase 3.
Supplying heavy-duty MS office containers, site offices, and portable cabins across Udyog Vihar Phase 3 Central, Udyog Vihar Phase 3 Industrial Belt, Udyog Vihar Phase 3 Commercial Enclave, Udyog Vihar Phase 3 Sector 1, and surrounding project zones in Udyog Vihar Phase 3.
Yes, SR Enterprises offers comprehensive transport, crane-assisted unloading, and secure positioning throughout Udyog Vihar Phase 3. We ensure the cabin is level and ready to use.
Standard models can be delivered and set up within 7 to 14 days. Customized layouts, double-storey site offices, or large accommodation complexes in Udyog Vihar Phase 3 take approximately 3 to 4 weeks.
Absolutely. We offer site surveys across Udyog Vihar Phase 3 to ensure that there are no logistical constraints, checking overhead clearances and soil conditions beforehand.
Indeed. The structures feature top-tier thermal insulation panels and proper sealing, making them fully weatherproof and energy-efficient for air conditioning in Udyog Vihar Phase 3.
Call us at +91-9990968389 or send an enquiry. We’ll prepare a tailored quote and site plan.