Office Containers
Furnished site offices with flooring, lighting, AC provision and complete wiring.
- • 10ft / 20ft / 40ft sizes
- • Partition & glazing
- • Electrical & plumbing fit-outs
Focal Point Phase 2 • Ludhiana • Jalandhar • Amritsar
SR Enterprises supplies durable MS office containers, porta cabins, security cabins and toilet blocks across Focal Point Phase 2 with tailored fit-outs and rapid delivery.
350+
Units served in Focal Point Phase 2
Flexible
Custom fit-outs & paint
Support
Logistics & installation
20ft Office & Workshop Container
Fitted • Electrical • Paint options
Price
₹ On Request
Fabricated from certified IS 2062 structural steel to withstand Focal Point Phase 2's local weather conditions, high industrial loads, and multi-relocation wear.
| Component | Material Specification | Engineering Advantage |
|---|---|---|
| Main Chassis Frame | IS 2062 Grade MS 100x50mm C-Channels & Tubular Sections | Heavy-duty structural base; supports multi-storey crane stacking |
| Wall & Roof Shell | 1.2mm to 1.6mm thick Corrugated Mild Steel Sheets | 100% leak-proof, storm-resistant, secure against vandalism |
| Thermal Insulation | 50mm High-Density Glass Wool / Rigid PUF Panels | Maintains 24°C interior temperature in extreme climates |
| Interior Paneling | 9mm Pre-Laminated Particle Board or PVC Decorative Panels | Fire-retardant, elegant executive finish, easy to clean |
| Sub-Floor & Vinyl | 18mm Cement Fiber Board + 1.5mm Heavy PVC Vinyl | Rot-proof, moisture-sealed, anti-skid, high wear resistance |
| Electrical Network | Concealed ISI Fire-Retardant Copper Wiring + MCB Distribution | Shockproof, pre-wired for 1.5T AC, LED lighting and IT ports |
| Paint & Coating | Epoxy Zinc Phosphate Primer + Two Coats Synthetic PU Enamel | High UV resistance, prevents rust and oxidation in humid weather |
SR Enterprises provides robust, custom-designed MS containers and bunk houses throughout the Focal Point Phase 2 region. Designed to withstand extreme weather conditions, our units are perfect for retail shops, administrative offices, and worker accommodations. Enjoy fast site delivery, level positioning, and comprehensive setup support in Focal Point Phase 2 Area and surrounding areas.
Furnished site offices with flooring, lighting, AC provision and complete wiring.
Quick-install cabins for project teams, kiosks and temporary accommodation.
Hygienic toilet blocks and washrooms suitable for events and labour camps.
Compact guard cabins with glazing, counters and secure locking systems.
Specialised containers for workshops, canteens, storage and branded kiosks.
Stacked or linear multi-unit buildings suitable for larger project sites and campuses.
We work with manufacturing plants, events, institutions and construction companies across Focal Point Phase 2 delivering robust modular solutions.
Factory site offices, storage containers and workshops in industrial zones.
Ticket booths, sanitation blocks and temporary offices for events and public projects.
Security posts, guard cabins and on-site office units for logistics hubs and corporate campuses.
A clear four-step process to take your requirement from enquiry to on-site ready cabin.
Step 1
Share sizes, site details and desired fit-out.
Step 2
We give layouts, specifications and lead-time.
Step 3
Production, paint & fit-out in our workshop with QC checks.
Step 4
Site delivery, placement and handover with basic commissioning.
A glimpse of our office cabins, porta cabins, and sanitation units deployed and operational in and around Focal Point Phase 2.
SR Enterprises provides seamless delivery, custom design, and turnkey on-site installation of MS office containers, site cabins, security guard cabins, and sanitation toilet blocks across every corridor, sector, and industrial area in Focal Point Phase 2.
Supplying heavy-duty MS office containers, site offices, and portable cabins across Focal Point Phase 2 Central, Focal Point Phase 2 Industrial Belt, Focal Point Phase 2 Commercial Enclave, Focal Point Phase 2 Sector 1, and surrounding project zones in Focal Point Phase 2.
Absolutely. We handle the entire delivery process, including crane lift and leveling, for any location in Focal Point Phase 2. We also navigate tight access points and narrow streets without hassle.
Standard models can be delivered and set up within 7 to 14 days. Customized layouts, double-storey site offices, or large accommodation complexes in Focal Point Phase 2 take approximately 3 to 4 weeks.
Yes, we conduct preparatory site inspections in Focal Point Phase 2 upon request, planning crane paths and leveling requirements prior to delivery.
Yes, they are designed for durability in extreme climates. With double-layer thermal barriers (glass wool or PUF) and built-in AC brackets, the cabins stay cool in Focal Point Phase 2’s summer heat.
Call us at +91-9990968389 or send an enquiry. We’ll provide drawings, prices and delivery options tailored to your project.